Master Rigger Consulting

Crane and Rigging Project Planning in NYC

Before you book a crane, someone should tell you which one the job actually needs, which permits it requires, and which ones it does not.

You are paying for the plan. Who does the lift is still your call.

Daniel Berkman, NYC Master Rigger #214 One-hour response in working hours COI issued before work starts

What you get

We start with your drawings and a visit to the site. Not photos, not a description over the phone. A licensed Master Rigger who has run picks in this city, standing where the crane has to sit.

From there we go through the scope and the timeline, and we tell you which crane the job needs. Crane selection is not a preference. It comes out of the load weight, the working radius, the ground bearing, and what the access to the site will actually allow on the day. Sometimes that points at a mobile crane, sometimes a tower crane, and sometimes at something smaller than the one you had in mind.

That is rarely a single answer for the life of a job. Jobs change, and the machine that suits week one is often wrong by week nine, so we stay with it and tell you when the equipment needs to change.

Rigging NYC crew reviewing the lift on site before work begins
The site visit comes before the crane is booked, not after.

Everything we carry for you

Which permits the job needs, and which it does not
How often each one has to be renewed
Filing the crane permits for you
Street closure permits
MTA and Transit Authority approvals
NYPD coordination
Dealing with the engineers on your behalf
A certificate of insurance before anyone starts work
One person holding the whole scope together

Which permits you need, and which you don’t

Everyone in this business will happily file every permit on the list. Filing costs you money each time, and none of it comes back.

Permits do not attach to jobs by default. Each one attaches to a specific condition on your site, and where that condition is not there, the permit is not required. Knowing which line you fall on takes a rigger who has filed these before and watched what the agencies actually push back on.

A job in Manhattan might need a DOB Crane Notice, a DOT crane and boom occupancy permit, an after-hours variance, MTA sign-off if you are working over their infrastructure, and NYPD for the street. Or it might need three of those and not the other two. The difference is real money and several weeks.

Crane working from a closed New York City street under permit
Street occupancy, closures and boom swing all sit with different agencies.

DOB Crane Notice

Runs twelve months from the date it was originally filed, not from the day you paid it. Lapse it and you have thirty days to settle up before it expires for good.

DOT crane and boom occupancy

The one you cannot put a date on. Between one week and four, depending on scope, what else is happening in the area, and who else already holds a permit on that block.

After-hours variance

Standard construction hours run 7am to 6pm on a weekday. Anything outside that needs a variance, filed at least three business days ahead.

Street closure

Filed with DOT and coordinated with the precinct. Often the difference between a clean pick and a truck that cannot get into position.

MTA and Transit Authority

Needed where the work sits over or beside their infrastructure. Start these early, because they do not move to your schedule.

NYPD coordination

For closures and traffic control on the day. Handled alongside the DOT filing rather than as an afterthought.

Planned by a Master Rigger who has done the lift

Expediters file paperwork and have never operated a crane. Engineers seal lift plans and have never had to get a machine down a street with cars parked both sides.

A Master Rigger license is not a filing registration. The Department of Buildings issues it, and holds the license holder responsible for the safety of the lift itself.

No weight limitA Special Rigger license stops at 2,000 pounds on the outside of a building. A Master Rigger license does not stop.
Same tier as an engineerOne route to the license is a professional engineer who has verified critical pick plans across 25 separate New York City inspections. The DOB treats them as equivalent.
Earned on the streetFive years running rigging as a foreman in this city, plus a written and a practical exam.

Daniel Berkman holds New York City Master Rigger license #214. You are welcome to check it against the Department of Buildings records before you call.

Licensed Master Rigger performing a precision architectural pick in New York City
The plan comes from the person who has actually made the pick.

You still choose who does the work

To be plain about it: you are paying for expert service, not for a sales call. You can hire whoever you want for the lift.

Use the crane company you already know

Work with your usual supplier, or put the scope out and take the best number. Nothing here ties the lift to us.

The recommendation is unbiased

We do not have a machine sitting in a yard that needs to stay busy. When we say the job needs a smaller crane, that is the only reason we are saying it.

The plan is yours either way

If the work does come to us, good. It is not the point, and it is not a condition.

What it costs to get this wrong

A DOB stop-work order does not pause your costs. The crew is still on the clock, the crane is still on rate, and the schedule you sold your client does not move because a permit was filed wrong.

One violation, one job~$5,000per company, in our experience
Crane companyOperatorGeneral contractorSite safety managerConcrete suband whoever else is named

A violation is written to everyone named on the job, not only whoever made the mistake. So one filing error is not a five thousand dollar problem, it is five or six of them landing at once, and you are the one explaining it to your client.

Re-filing costs weeks, not just the fee

You go back in the queue behind everyone who got it right the first time, and in this city that queue is measured in weeks.

The quieter version

Nobody shuts you down. You just booked a crane bigger than the job needed and paid for that capacity every day it sat there.

None of it is dramatic. It happens constantly, and almost all of it gets decided before anyone turns a wheel.

A recent example

We did this for Raptor, a New York concrete contractor, on jobs where we were also completing the crane work. Drawings first, then the site, then the crane selection, then every filing that job needed across DOB, DOT and the street.

What it bought them was simple. They knew the equipment was right before it arrived, the permits were in hand before the date, and there was one number to call when something changed. It took the crane and rigging scope off their project management instead of adding to it.

The only difference now is that the planning stands on its own. You do not have to give us the lift to get it.

Crane and rigging scope managed across a live New York City construction site
Equipment right before it arrives, permits in hand before the date.

What clients say

How it starts

The first things we will ask you

What is the load, and what does it weigh?Weight and dimensions decide the machine before anything else does.
Where is the job, and what is the street like?Access, width, parking and what sits overhead all change the answer.
When is the work happening?Permit lead times run from a few days to several weeks, so the date sets the filing schedule.
Is anyone else already involved?If a crane company or an engineer is lined up, we work around them rather than over them.

Send the drawings and the date. During working hours you will hear back inside an hour.

Crane and rigging planning questions

Do we have to give you the crane work?
No. You are paying for the plan and the permits. Hire whoever you like for the lift, including a company you already work with.
We already have a crane company lined up. Can you still help?
Yes, and that is often when this is worth the most. We review what has been proposed, check the crane suits the site and the loads, and handle the filings around it.
How is this different from a permit expediter?
An expediter files what you tell them to file. We tell you what to file, choose the crane, deal with the engineers, and stay on it as the job changes. The credential behind the advice is a Master Rigger license issued by the Department of Buildings, not a filing registration.
How quickly can you start?
You will get a response within the hour during working hours. Site visits are usually arranged within a few days, depending on where the job is and what access is like.
Which agencies do you deal with?
The Department of Buildings, including the cranes and derricks unit, DOT for street and boom occupancy, NYPD for closures, and MTA or Transit Authority where the work affects their infrastructure.

Talk to us about the project

Send the drawings and the date, and we will tell you what the job actually needs, which permits it takes, and which ones you can leave alone.

Response inside an hour during working hours
First step is a site visit, not a phone quote
You keep the plan either way

Contact Us For more Details